G.R.I.P. News

Friday, 6 July 2007

Power system work on main tower at Hope Point

I will be performing some calibration and upgrade work on the main station at Hope Point tomorrow (June 7th).

This work will be about the early afternoon and should not necessitate any down time.

This will increase my ability to monitor the status of the power system at hope point and will help evaluation if the new wind generator is doing a good enough job to prevent a repeat of last winters weekly hikes up the hill with fuel!

0 Comments:

Post a Comment

Links to this post:

Create a Link

<< Home